{
  "scope": "Public research; no selected-lot traceability or supplier approval established",
  "researchDate": "2026-11-16",
  "record": {
    "id": "kennametal",
    "name": "Kennametal",
    "mineral": "Tungsten",
    "role": "Processor",
    "profileIds": [
      "kennametal-tungsten"
    ],
    "forms": "Tungsten processing and downstream materials",
    "location": "Huntsville, Alabama; Fallon, Nevada, United States",
    "status": "Facilities named · upstream origins unresolved",
    "read": "2026-11-16",
    "summary": "Its 2024 due-diligence report names two U.S. smelting operations and describes controls for origin and shipping documents.",
    "facilities": [
      "7300 Madison Blvd., Huntsville, Alabama · CID000105",
      "347 N. Taylor St., Fallon, Nevada · CID000966"
    ],
    "origins": [
      "No named upstream mine or complete origin-country inventory in the reviewed report"
    ],
    "connections": [],
    "sources": [
      {
        "title": "Public Due Diligence Report for 2024",
        "url": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
        "date": "2025-02-06",
        "locator": "Page 1: company locations; management-system and origin-control sections"
      }
    ],
    "needed": [
      "Feedstock sources for the selected processing lot",
      "Incoming shipment and country declarations",
      "Smelter output matched to the downstream manufacturer's receipt"
    ],
    "profiles": [
      {
        "id": "kennametal-tungsten",
        "organization": "Kennametal",
        "mineral": "Tungsten",
        "role": "Processor",
        "niche": "Tungsten processing (company-level)",
        "country": "United States",
        "scope": "Step 5 report covering the Huntsville, Alabama and Fallon, Nevada tungsten operations.",
        "period": "2024",
        "sourceDate": "2025-02-06",
        "website": "https://www.kennametal.com/",
        "summary": "The report identifies two U.S. operations and detailed controls. Its assessment chronology is internally ambiguous, so no current facility-conformance conclusion is made.",
        "reportedMetrics": [
          {
            "label": "Named tungsten operations",
            "value": "2",
            "source": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
            "locator": "PDF p.1, Scope",
            "asOf": "2025-02-06",
            "note": "Huntsville, Alabama and Fallon, Nevada; not every Kennametal activity."
          },
          {
            "label": "Assessment chronology",
            "value": "Clarification required",
            "source": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
            "locator": "PDF p.1, Assessment summary",
            "asOf": "2025-02-06",
            "note": "The report references a February 2022 last assessment, March 2025 target dates and an anticipated February 2025 assessment; Highbrow withholds a current conformance conclusion."
          }
        ],
        "reviewedAt": "2026-09-03",
        "reviewFlag": "",
        "flagSource": "",
        "independentReview": false,
        "reviewer": "",
        "evidence": {
          "policy": {
            "status": "supported",
            "source": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
            "locator": "PDF p.2, section 3",
            "note": "The policy addresses OECD Annex II risks."
          },
          "oversight": {
            "status": "supported",
            "source": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
            "locator": "PDF p.2, section 4",
            "note": "Procurement responsibilities and training are described."
          },
          "traceability": {
            "status": "partial",
            "source": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
            "locator": "PDF p.3, Controls and Transparency",
            "note": "Lot documentation and SAP tracking are described; records were not inspected."
          },
          "assurance": {
            "status": "partial",
            "source": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
            "locator": "PDF p.1, section 2",
            "note": "Assessment dates are ambiguous, so current conformance is not established."
          },
          "response": {
            "status": "supported",
            "source": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
            "locator": "PDF pp.3–4, sections 4–6",
            "note": "Grievance and risk-response processes are described."
          },
          "reporting": {
            "status": "partial",
            "source": "https://images.kennametal.com/is/content/Kennametal/kennametal-due-diligence-report_enpdf",
            "locator": "PDF p.1, heading and assessment summary",
            "note": "A dated report is available, but the assessment chronology needs clarification."
          }
        }
      }
    ]
  }
}