Risk Governance and Compliance Review Protocol
A reasoned decision, with a traceable record.
Version 1.2 · November 2026
Version 1 adopted September 13, 2026. Version 1.1 (October 2026) added the covered-materials module. Version 1.2 (November 2026) adds the mitigation-plan record.
This protocol turns critical-mineral sourcing evidence into accountable decisions. It tells a manufacturer or adviser how to define the question, establish what the evidence supports, assign each open issue an owner, request missing evidence, escalate to the right specialist and record a reasoned decision. Section 8 applies the same steps to the defense covered-materials rules that take effect on January 1, 2027.
1. Define the decision and its basis
Start with a real question: which claim needs checking, which material or product is involved, and what decision depends on it. Record the entity, facility where relevant, mineral, product form, geography, supply-chain role, reporting period, intended transaction and decision owner.
Classify the basis of the review:
| Basis | What to record |
|---|---|
| Law or regulation | The authority, effective date, jurisdiction and why it applies to this entity and transaction, confirmed by the appropriate professional |
| Contract | The clause, the parties and the period |
| Internal policy | The policy, its version and owner |
| Voluntary standard | The standard and version selected; never labeled as binding law |
2. Establish what the evidence supports
For every material claim keep the publisher, title, URL, exact page or section, entity or facility scope, reporting period, publication date and retrieval date. Record the supported wording and its limitation separately.
Use the CMMS-BS evidence states consistently: Supported, Partial, Gap (affirmative evidence of a deficiency), Unknown (silence) and Not applicable (with a recorded reason).
Keep the strongest relationship the source supports. A possible-upstream list does not establish a direct supplier, shipment, mine origin or product link.
A catalogue shows a material is offered; it does not show capacity, purity, origin or qualification. A company report shows a stated process; it does not show the process works.
3. Assign responsibility by risk domain
| Domain (provisional weight) | Question and evidence to seek | Review role |
|---|---|---|
| Legal, sanctions and trade (20%) | Which rules apply to these parties, this product, destination and transaction? Keep the official authority and any screening record | Trade-compliance professional; counsel as needed |
| Origin and traceability (20%) | What origin, facility, chain segment and period are evidenced? Separate possible links from transaction records | Sourcing or traceability specialist |
| Human rights (20%) | What credible labor-risk signals and response records exist? Separate indicators, allegations, findings and remediation | Responsible-sourcing or labor specialist |
| Operations and quality (15%) | Are tests, certificates and qualifications authentic, current and in scope? | Materials, engineering or quality specialist |
| Continuity and concentration (15%) | What is known about capacity, alternatives, geographic dependence and recovery? | Procurement or operations owner |
| Financial and commercial (10%) | Can the counterparty perform, and on what terms and exposure? | Commercial or finance reviewer; counsel for contract terms |
The adopting organization names the issue owner and the decision authority. One person may hold several roles when competent; record the relationship and any conflict.
4. Open an issue and choose the next step
Open an issue when a claim matters to the decision and the evidence is missing, contradictory, stale, ambiguously scoped or potentially adverse. Record the concern precisely without turning it into a finding. Assign an owner, domain, review role and due date suited to the decision.
A publication hold keeps an unsupported conclusion out of the benchmark. A procurement hold is a business decision made by the person with authority. Escalate suspected legal restrictions, serious labor allegations, disputed permits and unclear material qualification to the relevant specialist.
5. Request evidence and track follow-up
Ask a precise question tied to the issue: entity, material, period and the claim being checked. Request only the documents needed, with a legitimate basis to receive them. Record who asked, who answered, when, under what confidentiality terms, what was supplied and what is still missing. A non-response is recorded as such, never as proof of misconduct.
If a corrective action is agreed, record the action, owner, target date and the evidence that will show completion. Distinguish a promise from implementation, and implementation from effective remediation.
6. Record the decision and its limits
The decision record states the question, the sources considered, the material gaps, specialist input, the basis, the options weighed and the authorized decision with reasons, plus its permitted use, period and conditions. If evidence remains insufficient, the record says the matter is unresolved rather than inventing closure. Each record carries a review date or trigger: a new filing, an ownership change, an assessment-status change, a legal update or a credible correction.
7. Contract governance questions
| Issue | Question for procurement and counsel |
|---|---|
| Evidence and scope | Which origin, facility, product and period representations are required, and what records support them? |
| Change notification | Which ownership, origin, facility, permit, assessment or specification changes must be reported, to whom and when? |
| Verification and access | What document, audit or clarification rights are proportionate, and how are confidentiality and cost handled? |
| Follow-up and remedy | How are a substantiated concern, response, corrective action and dispute handled? |
| Sub-supplier information | What can the counterparty reliably obtain from its own suppliers, and what flow-down is realistic? |
| Records and permitted use | Who owns the records, and what retention, privacy and publication terms apply? |
8. Covered-materials module: DFARS 252.225-7052 and Executive Order 14415
From January 1, 2027, a contractor may not deliver under a contract containing DFARS 252.225-7052 any covered material "mined, refined, separated, melted, or produced" in a covered country, and the clause flows down to subcontracts. Executive Order 14415 ends routine waivers on the same date: after it, a waiver requires a mitigation plan accepted by the Secretary of War or a designee (CM-8). The order also directs guidance requiring all-tier supply-chain mapping and an indentured bill of materials traced "back to the origin of raw materials."
Covered materials: samarium-cobalt magnets; neodymium-iron-boron magnets; tantalum metals and alloys; tungsten metal powder; tungsten heavy alloy and any finished or semi-finished component containing it. Covered countries: North Korea, China, Russia and Iran.
CM-1. Find the covered material. Review the bill of materials, drawings and material specifications for each deliverable. Record every part that is, or contains, a covered material, with alloy or magnet type and weight where known.
CM-2. Check the exceptions and record the basis. The clause excepts certain end items: commercially available off-the-shelf items below 50 percent covered material by weight (from January 1, 2027); mill products such as bar, billet, wire, plate or sheet not yet incorporated into an end item, subsystem, assembly or component (from January 1, 2027); electronic devices unless the contract says otherwise; and neodymium-iron-boron magnets made from recycled material milled and sintered in the United States. A nonavailability determination is made by the government, not claimed by the contractor, and it is the waiver that Executive Order 14415 restricts: from January 1, 2027 it requires an accepted mitigation plan (CM-8). Record which exception is claimed and why; route doubtful cases to contracts or counsel.
CM-3. Trace each stage. For each covered material, record the country and facility for every stage the rule names, or mark the stage Unknown.
| Stage | Tantalum | Tungsten |
|---|---|---|
| Mining or feedstock | Ore or concentrate source; recycled feedstock origin | Ore or concentrate source; scrap or recycled feedstock origin |
| Refining and separation | Smelter or refiner identity and location | Processor of ammonium paratungstate or oxide |
| Melting or production | Metal and alloy production site | Metal powder and heavy-alloy production site |
| Component | Fabricator of the part delivered | Fabricator of the finished or semi-finished component |
CM-4. Match evidence to stage
| Evidence | What it can show |
|---|---|
| Mill test report or certificate of conformance | Where the metal or alloy was melted or produced, if stated |
| Smelter or refiner identification, with assurance-program status | Who refined the material and whether it was assessed; not by itself the mine of origin |
| Supplier origin declaration, stage by stage | The supplier's representation for each stage, for a named product and period |
| Purchase orders, lot numbers and traceability records | Which lot reached which part |
| Recycler documentation | The origin of recycled feedstock |
| Import and customs records | Country of shipment and declared origin |
CM-5. Screen ownership. Record whether any supplier in the chain is under the foreign ownership, control or influence of a covered nation, the test the executive order uses for an "unreliable foreign supplier."
CM-6. Decide and record
| Disposition | Action |
|---|---|
| Evidenced compliant at every stage | Record the evidence set and the review trigger |
| Unknown at one or more stages | Open an issue for each stage with an owner, an evidence request and a due date before delivery |
| Indicator of covered-country origin | Escalate at once to the contracts owner and counsel; the authorized person decides on delivery, alternative sourcing or a mitigation plan. If a mitigation plan is chosen, open the CM-8 record |
| Exception applies | Record the exception, its basis and who confirmed it |
CM-7. Build the indentured evidence record. For each deliverable, list each component and material by tier with its stage-by-stage evidence references. The same record answers the customer's flow-down request and the Department of War's bill-of-materials guidance when it issues.
CM-8. Keep the mitigation-plan record. From January 1, 2027, a waiver is available only under a mitigation plan accepted by the Secretary of War or a designee (Executive Order 14415, Section 2(b)). The plan is the contractor's to decide and submit; this record supplies its evidence. Open it when the authorized person chooses a mitigation plan under CM-6, keep one record for each covered material and contract, and keep it current until the plan is complete.
| What the plan must do | What to record |
|---|---|
| Identify the source of the non-compliant material | The CM-3 stage record for that material: country and facility at each stage, with the CM-4 evidence references |
| Document exhaustive efforts to acquire compliant material, or show that none was available | Each alternative source approached: supplier, date, what was requested, the response, and why it was not used (quality, quantity, form, price or lead time) |
| Describe the steps to remove the non-compliant material | Each step, its owner and the evidence that will show it is complete, such as a qualified alternative source or a requalified part |
| Set a strict projected timeline | A dated milestone for each step through full implementation, and the review trigger if a date slips |
9. Worked examples
Public-source example: Northern Graphite. On September 9, 2026, Northern Graphite announced that its appeal stays a suspension of its Lac des Îles lease and that the lease remains in effect. CMMS-BS placed the graphite profile on review hold. The issue record names the entity, site, lease question and source dates; assigns a legal and operating-status reviewer; sets a trigger for the next decision or company update; and keeps the company's stay statement with the record. No adverse finding is published while the question is open.
Illustrative example: tungsten heavy-alloy counterweights. A machine shop supplies counterweights to a defense subcontractor whose purchase order includes DFARS 252.225-7052. Under CM-1 the counterweights are tungsten heavy alloy, a covered material. Under CM-2 no exception applies. Under CM-3 and CM-4 the file holds a mill certificate naming a U.S. alloy producer (melting and production evidenced) and a powder supplier's company-wide template listing six possible refiners (refining Unknown; mining Unknown). The issue log opens two items: a stage-specific origin declaration from the powder supplier for the lots used, and refiner identification for those lots, both due before the next delivery. The decision record holds delivery approval with the subcontractor's contracts owner until both close. Had the powder supplier's declaration named a refiner in China, CM-6 would have escalated the case to the contracts owner and counsel; if they chose a mitigation plan, the CM-8 record would name that refiner as the source, log each alternative powder supplier approached and its response, and set dated steps to requalify the counterweights with compliant powder.
10. Record templates
Issue record
| Field | Entry |
|---|---|
| Issue ID and date opened | |
| Entity and facility | |
| Mineral, product, role, geography, period | |
| Decision that depends on the claim | |
| Source, URL and exact locator | |
| Publication date, reporting period, retrieval date | |
| Supported claim and its limitation | |
| Domain and basis (law, contract, policy, standard) | |
| Missing, contradictory or time-sensitive evidence | |
| Owner, specialist and decision authority | |
| Next request, due date and reason |
Evidence request and action record
| Field | Entry |
|---|---|
| Issue ID, owner, date requested | |
| Recipient, question and evidence requested | |
| Response date, source and use conditions | |
| What the response establishes; what remains open | |
| Corrective action, owner and target date | |
| Completion evidence and who checked it |
Decision record
| Field | Entry |
|---|---|
| Issue ID, decision date and decision maker | |
| Sources reviewed and remaining limitations | |
| Basis, specialist input and options considered | |
| Decision, permitted use and reasons | |
| Conditions before further action | |
| Benchmark status: retained, revised, withheld or withdrawn | |
| Next review date or trigger, and owner |
Mitigation-plan record (CM-8)
| Field | Entry |
|---|---|
| Contract, deliverable and covered material | |
| Source of the non-compliant material, by stage, with evidence references | |
| Alternative sources approached: supplier, date, request, response, reason not used | |
| Removal steps, owners and completion evidence | |
| Milestones and dates through full implementation | |
| Decision authority, submission date and waiver decision |
Free to read, print and apply. During the beta, Highbrow Group does not review your documents, run evaluations for you or deliver any work.
CMMS-BS assesses what public sourcing disclosures establish. It is not a certification, an audit or legal advice.