A DRC mine and KEMET's integrated ore-processing, powder and capacitor operations. The powder-production location later changed.

← Tantalum research

Historical company account Historical configuration described 2014–2018; relocation disclosed FY2020; current snapshot Jun 2026

Carson City powder production ceased in December 2019 and its equipment moved to Matamoros in fiscal 2020. The June 2026 report confirms Matamoros processing but does not name Kisengo as a current input mine.

  1. 01Kisengo mine · MMRDemocratic Republic of Congo
  2. 02KEMET · MatamorosMatamoros, Mexico
  3. 03KEMET Blue Powder · Carson CityNevada, USA · historical, not current
  4. 04KEMET · Mexican capacitor operationsMexico · route-specific plant not established
  5. 05Tantalum capacitor product familyKEMET product category

Stage 1 · Mine / mining partner

Kisengo mine · MMR

Democratic Republic of Congo

Output: Tantalum ore / concentrate

KEMET's CEO names Kisengo and MMR in the historical mine agreement; the account is corroborated by corporate testimony in a congressional record.

Evidence: Named mine and historical agreement

Sources and missing documents

Still needed: Current mine contract, concession identity, dispatch, tags, assays and matching processor receipt.

About KEMET's Closed-Loop, Conflict-Free, Tantalum Supply Chain ↗
2014-11-25 · Paragraphs beginning We get tantalum ore directly and To complete the supply chain
Historical company account; no current shipment records, SKU allocation or independent mine verification.

Dodd-Frank Five Years Later: What Have We Learned from Conflict Minerals Reporting? ↗
2016 (printed); hearing 2015-11-17 · Loof oral statement; appendix prepared statement identified at p. 68
Company testimony in an official hearing record; government publication does not independently verify corporate assertions.

KEMET Corporation Conflict Minerals Report for January 1-December 31, 2017 ↗
2018-05-03 · Design of Our Due Diligence Measures; Summary of Due Diligence Measures Performed item 2
No particular SKU/lot origin allocation; historical reporting period.

Stage 2 · Ore processing / integrated smelter-refiner stage

KEMET · Matamoros

Matamoros, Mexico

Output: K-salt intermediate

The 2014 CEO account identifies the Mexican ore-processing facility feeding the powder operation. The historical chain is a company account, not a transfer reconciliation.

Evidence: Named processing location and intermediate

Sources and missing documents

Still needed: Shipment receipts, processing charge and K-salt input/output records.

About KEMET's Closed-Loop, Conflict-Free, Tantalum Supply Chain ↗
2014-11-25 · Paragraphs beginning We get tantalum ore directly and To complete the supply chain
Historical company account; no current shipment records, SKU allocation or independent mine verification.

KEMET Corporation FY2020 Form 10-K ↗
2020-05-28 · Raw Materials; Solid Capacitors Reportable Segment; KEMET in Mexico
No current named-mine list, shipment linkage or specific SKU; Carson City cannot be shown as current from older sources.

Stage 3 · Powder conversion · historical site

KEMET Blue Powder · Carson City

Nevada, USA · historical, not current

Output: Capacitor-grade tantalum powder

The 2014 account identifies Carson City. The FY2020 filing records its relocation to Matamoros; it must not be shown as the current route.

Evidence: Historical facility; later relocation documented

Sources and missing documents

Still needed: Historical input/output lot records, or current Matamoros records for a current part.

About KEMET's Closed-Loop, Conflict-Free, Tantalum Supply Chain ↗
2014-11-25 · Paragraphs beginning We get tantalum ore directly and To complete the supply chain
Historical company account; no current shipment records, SKU allocation or independent mine verification.

KEMET Corporation FY2020 Form 10-K ↗
2020-05-28 · Raw Materials; Solid Capacitors Reportable Segment; KEMET in Mexico
No current named-mine list, shipment linkage or specific SKU; Carson City cannot be shown as current from older sources.

Stage 4 · Capacitor manufacturer

KEMET · Mexican capacitor operations

Mexico · route-specific plant not established

Output: Manufactured tantalum capacitors

Company filings identify Mexican tantalum-capacitor manufacture. The reviewed public records do not assign the selected mine material to one manufacturing plant or production lot.

Evidence: Product manufacture; plant allocation absent

Sources and missing documents

Still needed: Exact capacitor plant, production lot and powder-to-capacitor material mapping.

KEMET Corporation Conflict Minerals Report for January 1-December 31, 2017 ↗
2018-05-03 · Design of Our Due Diligence Measures; Summary of Due Diligence Measures Performed item 2
No particular SKU/lot origin allocation; historical reporting period.

KEMET Corporation FY2020 Form 10-K ↗
2020-05-28 · Raw Materials; Solid Capacitors Reportable Segment; KEMET in Mexico
No current named-mine list, shipment linkage or specific SKU; Carson City cannot be shown as current from older sources.

KEMET Corporation 2025 Conflict Minerals Report ↗
2026-06-03 · p. 2; p. 6 Step 4(B); pp. 7-8; p. 11 Table 1
No Kisengo mention or current mine-to-part batch proof; facility due-diligence assessment does not allocate an individual component.

Stage 5 · Finished component

Tantalum capacitor product family

KEMET product category

Output: Tantalum capacitors

The endpoint is a finished electronic component category. No particular series, SKU or consumer device is assigned to Kisengo by this research.

Evidence: Product category, without mine-specific SKU

Sources and missing documents

Still needed: Part number, date code, production lot and, for an OEM device, BOM and receiving records.

KEMET Corporation Conflict Minerals Report for January 1-December 31, 2017 ↗
2018-05-03 · Design of Our Due Diligence Measures; Summary of Due Diligence Measures Performed item 2
No particular SKU/lot origin allocation; historical reporting period.

KEMET Corporation 2025 Conflict Minerals Report ↗
2026-06-03 · p. 2; p. 6 Step 4(B); pp. 7-8; p. 11 Table 1
No Kisengo mention or current mine-to-part batch proof; facility due-diligence assessment does not allocate an individual component.

A historical mine-to-capacitor pathway is described in company records. A current Kisengo-to-part connection and consumer-device link remain unestablished.

These routes illustrate production and evidence handling. Applicability to covered defense material forms must be assessed separately.