Stage 1 · Mine and concentration
Mittersill mine
Salzburg, Austria
Output: Scheelite ore and tungsten concentrate
The operator identifies Mittersill as a source for its St. Martin powder operations.
Evidence: Operator identifies the mine and destination
Sources and missing documents
Still needed: Mine dispatch lot, concentrate assay and matching refinery receipt.
The Mittersill mine ↗
Undated · Final body paragraph
Public operator account; no individual shipment, customer or batch allocation.
Wolfram Due Diligence Report for Mineral Supplies in Year 2024 ↗
2025-04-15 · pp. 1-2 company/materials; p. 3 assessment
Management-system assessment not individual product origin; Austrian refinery scope, not all group facilities.
Stage 2 · Smelter / refiner and powder production
WBH · St. Martin im Sulmtal
Styria, Austria · CID002044
Output: APT intermediate, tungsten oxide, metal and carbide powder
Extraction, purification and powder production take place within one integrated facility. Mittersill feed is combined with other concentrate; the operator also processes recycled inputs.
Evidence: Named facility and transformations published
Sources and missing documents
Still needed: Input lots, charge records, output batches, recycling share, allocation method and material reconciliation.
From raw material to powder ↗
Undated · Main text, three process paragraphs
Mixing explicit; no exclusive-origin claim for a finished item.
Wolfram Due Diligence Report for Mineral Supplies in Year 2024 ↗
2025-04-15 · pp. 1-2 company/materials; p. 3 assessment
Management-system assessment not individual product origin; Austrian refinery scope, not all group facilities.
Stage 3 · Manufacturer
Sandvik Coromant · Gimo
Gimo, Sweden
Output: Pressed, sintered, ground and coated carbide inserts
Coromant's manufacturing video identifies Gimo and says its carbide comes from recycling or its own Austrian mine. This supports the reported route without identifying a delivery lot.
Evidence: Manufacturer describes its input sources and process
Sources and missing documents
Still needed: WBH dispatch and Gimo receipt, powder charge and production order for a selected insert.
How carbide inserts are made by Sandvik Coromant ↗
2024-02-14 (hosted page); original video upload date not confirmed · Opening material warehouse transcript and manufacturing sequence
Historical process video; no part-specific origin or current allocation. Generic video cannot prove a named insert grade is Mittersill-origin.
The Mittersill mine ↗
Undated · Final body paragraph
Public operator account; no individual shipment, customer or batch allocation.
Stage 4 · Finished industrial product
Cemented-carbide cutting inserts
Gimo production example
Output: Finished cutting inserts, laser marked and packaged
The video reaches a finished industrial product category. It does not allocate a particular insert grade or SKU to Mittersill material.
Evidence: Finished product category shown
Sources and missing documents
Still needed: Insert SKU, marking and lot mapping to the selected powder batch.
How carbide inserts are made by Sandvik Coromant ↗
2024-02-14 (hosted page); original video upload date not confirmed · Opening material warehouse transcript and manufacturing sequence
Historical process video; no part-specific origin or current allocation. Generic video cannot prove a named insert grade is Mittersill-origin.